Pune University BE Production Engineering CIM and Industrial Robotics Question Papers
B.E. (Production S/W) COMPUTER INTEGRATED MANUFACTURING AND INDUSTRIAL ROBOTICS (2008 Pattern) (Elective – I) (Sem. – I) Time :3 Hours] [Max. Marks :100 Instructions to the candidates:- 1) Answer any three questions from Section I and any three questions from Section II. 2) Answers to the two sections should be written in separate answer books. … Read more